This past week has been pretty hectic, from making deadlines, to midterm tests to research papers, I can say that it’s been one of the busiest weeks of the year.
- To make all of these deadlines I was staying up to at least 2 AM to get everything completed.
I was up that late Tuesday through Friday. I was easily looking forward to sleeping in Saturday morning. I have consistently felt like if I stay up late multiple times in a row, my body will not be in my favor and my immune system will shut down. Then I’ll start getting frosty symptoms, and this has happened to me plenty of times and I was trying to prevent getting these symptoms again by having the option to sleep in. Unluckyly my sleeping in until 10:30 AM was split short by the sound of ladders and clacking. I opened my loft door to the hallway of the loft lobby and I saw contractors. They were on ladder taking the ceiling stone off. It looked like they were Heating, Ventilation and A/C contractors working on the ductwork system. Since I was already awake, I got ready for the day and decided to go get coffee. When I was walking past the Heating, Ventilation and A/C contractors I saw the ductwork system. It was flexible ductwork since it had to maneuver throughout the hallway to other loft rooms. I’ve heard that flexible ductwork should be evaluated and pulled slender to reduce inner air resistance. It’s a nice type of ductwork and actually flexible.